How fast and convenient we can charge EVs? – said in Berlin on eMove360° Petros Spinaris VP for Sales&Marketing of Ekoenergetyka.
We strive to implement as many fast charging station projects as possible and we are ready with high technology.
Also following the progress of the adoption of the Fit for 55 package.
So what is the biggest challenge facing the industry now?
For sure transformation of the power grid and improving the Li-Ion battery technology. Battery Electric Vehicles in massive growth and no doubt heavy duty transport will also be revolutionized.
Megawatt charging system is strategy for e-Trucks.
What is our Today:
Power Unit Axon Side 360 – built for IONITY contract
User Unit: up to 350kW with liquid-cooling system
Infrastructre ready for 1 MW power
Our Tomorrow:
Extension of base station with an additional power sharing module in current customer’s infrastructure
Intallation of new satellite with 1000A / 1000V connector for each parking space (at a convenient time)