Ekoenergetyka’s new 800 kW charging system now under testing at IONITY

800 kw charigng system by ekoenergetyka, Ekoenergetyka’s new 800 kW charging system now under testing at IONITY, Ekoenergetyka

Ekoenergetyka has supplied its latest innovation – an ultra-fast, high-power charging system with up to 800 kW total output – to one of Europe’s leading Charge Point Operators, IONITY,  for initial evaluation.

Currently being tested by IONITY near Munich, this Axon Side DLBS-based split solution features two power units with dynamic load balance system and up to six satellite outputs. Built for performance, scale, and efficiency, the system introduces:

  • Next-gen SiC power modules (up to 96.8% efficiency)
  • High-resolution power control (66.7 kW per output)
  • Active power factor compensation ensures grid-friendly operation at the module level
  • Intelligent energy distribution under peak demand
  • Flexible scalability for high-traffic charging hubs

With this new solution, Ekoenergetyka is pushing the limits of EV charging – enabling faster turnaround, smarter power use, and infrastructure designed for future needs.

Pilot installations of the 800 kW system are set to launch across Europe in autumn 2025.